CompletedPublic sector

Chitila Town Police Headquarters

Demolition of a seismically vulnerable building and construction of a new GF+2F headquarters for the Chitila Town Police, sized for 100 officers, with photovoltaic panels and EV charging stations.

Chitila Town Police Headquarters

The project involved demolishing the former Chitila Town Police headquarters, a deteriorated building with seismic risk, and constructing a new building on the same 1,113 sqm site for the General Inspectorate of the Romanian Police (IGPR). The completion handover took place in April 2026.

Key data

  • Height regime: ground floor + 2 floors (second floor set back)
  • Area: almost 1,300 sqm
  • Capacity: a staff of 100 police officers
  • Importance class I (buildings with essential functions)
  • 14 parking spaces, 3 of them with electric vehicle charging stations

Layout

  • Ground floor: public reception area (waiting room, registry) and technical rooms
  • First floor: offices for operational staff, locker rooms and a staff gym
  • Second floor (set back): management offices, conference room, dining room and rest areas

The building also includes an armoury and an integrated dispatch centre.

Technical solutions

  • Rigid-box foundation and reinforced concrete frame structure
  • Ventilated façade with fibre-cement cladding
  • Aluminium joinery with burglar-resistant, solar-control glazing
  • High-performance thermal and acoustic insulation, efficient HVAC systems
  • Photovoltaic panel system to reduce grid energy consumption
  • Landscaped grounds with green areas

Video